level2:building_graphs_in_level2
This is an old revision of the document!
Building graphs in Level2
Graphs in Level2 very similar to custom graph in WebHMI with minor differences:
- It is possible to save graph configuration and then load again
- Node selection
- Override color for the curves
- Build graph - redraws graph viewing area with the current selectoion of the registers, colors, scale, date etc.
- Save graph - save current settings
- Delete graph - deletes saved graph settings
- (↓) - downloads data from graph to csv-file
- Calendar - to select date or date range
level2/building_graphs_in_level2.1613141617.txt.gz · Last modified: 2021/02/12 14:53 by atolstov